Project goals
Improved efficiency of designing new types of aircraft.
Project timeline
November 2013 – April 2014
Project summary
In the project, Borlas Group provided the environment for:
- Designing complex products;
- Digital BOM management;
- Master data management.
The solution capabilities allow for approving and making changes to the design documentation in electronic form, which contributes to a significant reduction in labor intensity and duration of approval procedures and improves the quality of design documentation.
Hardware and software complex powered by Teamcenter® PLM system provides:
- Reduced time and cost of design preparation for production guaranteed by:
- 3D model applications;
- Approval of design documentation for manufacturability in documentation release;
- Reduction in design data development time;
- Reduction in time to make changes.
- Improved quality of design documentation guaranteed by:
- Application of a 3D model as an original design documentation;
- Controllability and transparency of design preparation for production.
Chapter
Branch
Customer
Platform